Hello Kiran ,
Actually i made on Ztabel where we maintain weight for the all material used for FG
then wen we do MRP run for this FG material through MD02 it should match that weight with
the all weight of all BOM material of FG if BOM weigh exceed the FG weight MRP should
not run . and have tried these Exit but not calling in MD02 tcode
Thanks & Regards
Gaurav Sharma